top of page
HEADWORKS WASTEWATER TREATMENT PLANT
SkyLine provided the design, six types of equipment, labor, and management for the installation and removal of over 56,000 square feet of falsework and formwork. In addition, SkyLine installed over 5,000 linear feet of edge form and handrailing for the construction of a four-story headworks pumping structure. The structure featured more than 18 levels of concrete soffits and beams, with some slabs reaching a thickness of 9' and beams extending as deep as 5'.
bottom of page